Dredge wheeler essayons

The eleven-month project will commence in February with phase one pre-planning, engineering, and scheduling portion. The second phase begins in July with the Dredge WHEELER on the SSR drydock for capital improvements, maintenance and repair work comprising of renovations to the propulsion system, the dredge generator system, and the ship service generators. Modifications to the fresh water cooling system, repowering fuel systems, walkways, electrical systems, Integrated Control and Monitoring system, as well as, the navigation and controls system will also receive upgrades.

Dredge wheeler essayons

dredge wheeler essayons

Media:

dredge wheeler essayonsdredge wheeler essayonsdredge wheeler essayonsdredge wheeler essayons